Hydraulic Butt Fusion Welding Machine for Water Gas Supply
Features&Advantages:
- The circuit breaker works with electricity leakage protection switch.
- Bigger load capacity solid relays, longer service life.
- Advanced temperature-controlled switch.
- Accumulator: keep the pressure stable for welding procedure.
- Safety valve mounted on the side of the hydraulic block.
- Using integral shaft instead of assembled shaft.
- STUCCHI quick coupling, more stable.
- Brass iron meets iron, more soft than iron, longer service life.
- Dupont Teflon-coating heating plate.
- Non-fan and sufficient power motor.
Hydraulic Butt Fusion Welding Machine Series
MM-Tech Manufacturing hydraulic butt fusion welding machine which have cartridge valve easy to replace.
Certification:
CE certificate
FAQ:
What is The Warranty Period Of MM-TECH Hdpe Fusion Machine?
All machines made by MM-TECH are under a 2 years warranty since dispatched from MM-TECH factory. For more details, please consult with Ml-TECH sales and view <MM-TECH WARRANTY CERTIFICATE>.
What standards of Thermoplastic Pipe are applicable?
Welding standard according to Germany Standard: DVS2207-1-2016
- International Standard: 1SO21307-2017
- America Standard: ASTM F2620-19 (high pressure)
- America Standard:ASTM F714-13
How Could We Select The Right Equipment For Our Project?
MM-TECH could offer a variety of pipe fusion machine size up to 3000mm O.D. And each machine has the model number that indicates the maximum pipe size it can fuse, For example, butt fusion machine V630 could fuse maximum pipe 630mm 0.D., and from the specification chart, you could always find the minimum size it can fuse. lf you have specific requirements for your projects, please consult with MM-TECH sales
How Long Should it Take To Make A Fusion Joint?
Time needed to make a fusion joint depends on the welding norms, pipe material, pipe diameter, pipe wall thickness.and operator experiences
How Could We Calculate The Soaking Time?
The proper soaking time varies depending on the pipe material, pipe diameter, and wall thickness. You could always find the soaking time from MM-TECH operation manual for the polyethylene welding machine
After Welding, Could We Lay Down The Jointed Pipes On The Ground For Cooling Process?
You are not allowed to lay down the jointed pipes on the ground after fusion welding, The jointed pipe should stay in the machine with/without pressure (according to different welding norms) until the cooling time ends
Quality Warranty:
Machines Quality Warranty: 24 months. If any main parts are broken or can not work under normal operating, we will provide them for free
After-sales Service:
24/7 after sales service