Manual Butt Fusion Welding Machine Teflon-coated Heating Plate

Features&Advantages:

  • A heating plate with digital display installed on the handle.
  • Brass fasten screws make the compatible life much longer.
  • A Teflon coated heating plate with a separate temperature control system.
  • A trimmer with safety switch.
  • Support for milling cutter and heating plate.
  • Premium tooling box.
Manual Butt Fusion Welding Machine
Products Categories
Get A Free Quote
Contact Form Demo (#3)

Manual Butt Fusion Welding Machine Series

MM-Tech Manufacturing manual butt fusion welding machine which have handle easy to push or shake.

Manual Butt Fusion Welding Machine (2)
Manual Butt Fusion Welder (17)
More Information

Certification:

CE certificate

FAQ:

What is The Warranty Period Of MM-TECH Hdpe Fusion Machine?

All machines made by MM-TECH are under a 2 years warranty since dispatched from MM-TECH factory. For more details, please consult with Ml-TECH sales and view <MM-TECH WARRANTY CERTIFICATE>.

What standards of Thermoplastic Pipe are applicable?

Welding standard according to Germany Standard: DVS2207-1-2016

  • International Standard:1SO21307-2017
  • America Standard: ASTM F2620-19 (high pressure)
  • America Standard:ASTM F714-13

How Could We Select The Right Equipment For Our Project?

MM-TECH could offer a variety of pipe fusion machine size up to 3000mm O.D. And each machine has the model number that indicates the maximum pipe size it can fuse, For example, butt fusion machine V630 could fuse maximum pipe 630mm 0.D., and from the specification chart, you could always find the minimum size it can fuse. lf you have specific requirements for your projects, please consult with MM-TECH sales

How Long Should it Take To Make A Fusion Joint?

Time needed to make a fusion joint depends on the welding norms, pipe material, pipe diameter, pipe wall thickness.and operator experiences

How Could We Calculate The Soaking Time?

The proper soaking time varies depending on the pipe material, pipe diameter, and wall thickness. You could always find the soaking time from MM-TECH operation manual for the polyethylene welding machine

After Welding, Could We Lay Down The Jointed Pipes On The Ground For Cooling Process?

You are not allowed to lay down the jointed pipes on the ground after fusion welding, The jointed pipe should stay in the machine with/without pressure (according to different welding norms) until the cooling time ends

Quality Warranty:

Machines Quality Warranty: 24 months. If any main parts are broken or can not work under normal operating, we will provide them for free

After-sales Service:

24/7 after sales service

Scroll to Top

Get A Free Quote Now !

Contact Form Demo (#3)
If you have any questions, please do not hesitate to contatct with us.