Suspending Butt Fusion Welding Machines

Features&Advantages:

  • High-Precision Welding: Designed for high-standard industries, the SBT-110 guarantees stable, durable welds, making it indispensable for applications requiring exacting precision.
  • Portable, User-Friendly Design: Its suspended structure facilitates easy operation, especially in confined or complex environments, reducing operational strain.
  • Unmatched Customer Support: Our experienced technical team is always ready to provide prompt and effective solutions, minimizing downtime and labor costs during welding operations.
Suspending Butt Fusion Welding Machines
Products Categories
Get A Free Quote
Contact Form Demo (#3)

Suspending Butt Fusion Welding Machines Series

MM-Tech proudly presents the Suspended Butt Fusion Welding Machine, a cutting-edge solution designed to meet the rigorous standards of modern industries.

Suspending Butt Fusion Welding Machines (1)
More Information

Certification:

CE certificate

FAQ:

What is The Warranty Period Of MM-TECH suspending butt fusion welding machine?

All machines made by MM-TECH are under a 2 years warranty since dispatched from MM-TECH factory. For more details, please consult with Ml-TECH sales and view <MM-TECH WARRANTY CERTIFICATE>.

What standards of Thermoplastic Pipe are applicable?

Welding standard according to Germany Standard: DVS2207-1-2016

How Could We Select The Right Equipment For Our Project?

MM-TECH could offer a variety of pipe fusion machine size up to 3000mm O.D. And each machine has the model number that indicates the maximum pipe size it can fuse, For example, supending butt fusion machine SBT-110 could fuse maximum pipe 110mm 0.D., and from the specification chart, you could always find the minimum size it can fuse. lf you have specific requirements for your projects, please consult with MM-TECH sales

How Long Should it Take To Make A Fusion Joint?

Time needed to make a fusion joint depends on the welding norms, pipe material, pipe diameter, pipe wall thickness.and operator experiences

How Could We Calculate The Soaking Time?

The proper soaking time varies depending on the pipe material, pipe diameter, and wall thickness. You could always find the soaking time from MM-TECH operation manual for the polyethylene welding machine

After Welding, Could We Lay Down The Jointed Pipes On The Ground For Cooling Process?

You are not allowed to lay down the jointed pipes on the ground after fusion welding, The jointed pipe should stay in the machine with/without pressure (according to different welding norms) until the cooling time ends

Why Choose MM-Tech?

MM-Tech is dedicated to delivering high-quality thermoplastic welding machines and comprehensive project solutions. The SBT-110 has proven its worth in the market, gaining trust and recognition from users worldwide. With MM-Tech, you’re not just purchasing a welding machine—you’re investing in efficiency, precision, and reliability.

Choose MM-Tech. Experience Excellence.

Quality Warranty:

Machines Quality Warranty: 24 months. If any main parts are broken or can not work under normal operating, we will provide them for free

After-sales Service:

24/7 after sales service

Scroll to Top

Get A Free Quote Now !

Contact Form Demo (#3)
If you have any questions, please do not hesitate to contatct with us.